216 Ridgedale Rd

Tue 07 October, 2003

Day 5: The roof goes up, trusses + sheathing, along with the fourth and final wall. Only a few windows have been cutout to allow access to the second floor, making the inside dark but spacious. Meanwhile, all of the cedar shakes on the lower story have been removed, leaving only the tar paper and sheathing behind.

Morning visit
Meet the crew
Roof in place, eve
2 ft overhang
Rear of house
Funny kink in eave
Rear view, sunset
Kink visible at left
Low light shot from up street
1.5 s exposure


Prev Main Next