216 Ridgedale Rd
Wed 15 October, 2003
Work resumes. The damaged hardwood floors are ripped out, the
first-floor bathroom is stripped, and re-framing of the first floor
perimeter begins.
Windows have arrived
 |
Bare floors, rear of house
 |
New front and east walls
 |
Bathroom framing
 |
Bathroom-to-be
 |
Floor removal, front
 |
Wide open spaces, front
 |
Rear doors torn off
 |
Doors and bathroom parts
 |
Front door, askew
 |
Std front shot
 |
Soffit in hand as well
 |
|
|
|