First-floor framing resumes. The library and bathroom walls are in place, as it the refrigerator nook. After several tries, the kitchen windows are properly framed. The mechanical closet remains, as well as several modifications upstairs along with a proper sizing of the rough opening for the back door.
The pictures below are from the morning visit, before the new framing began.
| Prev | Main | Next |