Window opening and walls are moved to final locations upstairs as
electrical wiring spreads around the second floor. Second-floor
windows are installed, and work on modifying pre-existing first-floor
walls for first-floor windows is in progress.
The window openings are opened with a chainsaw in the late
morning. Both the MBR wall and second bathroom wall have been moved. By
dusk, all but the two largest upstairs windows have been installed on the
second floor.
Window openings made
 |
Building permit issued at last
 |
First-floor bathroom framing
 |
Bathroom entrance
 |
Library entrance
 |
Library-bathroom wall
 |
Lumber cave
 |
Windows installed
 |
Bathroom window opening
 |
West wall window 1
 |
West wall window 2
 |
West wall, second floor
 |
Rear view
 |
Family room window opening
 |
Out the French doors to backyard
 |
Out 2BR front window
 |
View out MBR front window
 |
Contentious east window in MBR
 |
Side window, 2BR
 |
Both 2BR windows
 |
View out large rear window over stairs
 |
Special framing required on first floor
 |
Discarded old windows
 |
Kitchen rear window opening
 |
Hand-placed "3-ganger" in kitchen
 |
Refrigerator nook in twilight
 |
Back door, kitchen window openings
 |
Second east window, MBR
 |
East wall of house, enshrouded
 |
Most front windows in
 |
Remaining windows in garage
 |
Including the largest ones
 |
|
|
|