216 Ridgedale Rd

Tue 28 October, 2003

Framing for first-floor windows and doorways finishes up. Custom work is required for each opening since the wall consists of new 2×4's adjoining the pre-existing 2×3 walls. By the end of the day, all of the smaller windows on the first floor are installed, and the old window openings are filled in. Finally, a layer of impervious Tyvek is tacked over the exterior.

Work in progress on library window
Old LR window cleared out
Framing in progress
   