More windows installed
 |
Slits mark open doorway, window
 |
Library front window
 |
Library side window
 |
Family room window
 |
Old window openings covered
 |
Toys removed from floor register
 |
Front door— in repose
 |
Water pools in the front yard
 |
Lunch break perspective
 |
Drain lines for bathrooms begin to grow
 |
Pick a siding color . . .
 |
Main heating plenum takes shape
 |
Drain lines, vent continue to grow
 |
New location of water meter
 |
Fresh cement in bottom of heat dist. box
 |
2nd floor drain lines, from below
 |
Water lines buried at last
 |
Buried drain line for main kitchen sink
 |
Toilet plumbing, from below
 |
Enlarged second bathroom doorway
 |
Second bathroom, jambless
 |
Whirlpool tub, MBATH
 |
Toilet ring, MBATH
 |
Tub/shower in 2nd bathroom
 |
Floor registers cut out
 |
Pocket door kit for MBR closet installed
 |
Pocket door into MBATH
 |
New bracing on underside of roof near seams
 |
Cutaway for tub drain
 |
Furnace arrives
 |
|
|
|
|