Soffit and fascia are finished by nightfall, including installation of
the cedar corner trim boards and the special top border trim that rings
the house. Another giant leap in plumbing is complete. A large part of
the day is spent in assembling the main heating duct, which will run the
width of the house to feed the seven second-floor registers.
The veil is lifted
 |
Gratuitous frontal shot
 |
Soffit rounds the corner
 |
West corner
 |
Closeup of west corner
 |
Finshed east front corner
 |
Heating trunk line under construction
 |
Water, sewer trenches filled in
 |
Old sewer pit filled in
 |
Drain lines for 2nd floor
 |
Drain run from underside
 |
Drain line to MBATH
 |
Vent, drains in 2nd floor
 |
Trap for 2nd bath tub
 |
Some assembly required
 |
Nightfall; soffit and fascia complete
 |
Cedar trim defines corners
 |
Completed corner
 |
Side view
 |
Rear view
 |
"Stuff" still in back yard
 |
Kitchen layout marked on concrete
 |
Close your eyes and imagine a stove
 |
Concrete pulled away from drain+main
 |
Front door, upright at last
 |
Finished corner, showing horiz+vert trim
 |
Rear corner, from side
 |
Persepective from down the street
 |
Look, it's dark out
 |
Looking into LR window
 |
Takeoff for one register off main duct
 |
Central heating duct in place
 |
Sunset out MBR window
 |
View along front eave out MBR
 |
Closeup of corner cedar
 |
Sunset out rear window
 |
Rear bedroom wall
 |
Raking the back yard in the dark
 |
Drain lines for MBTH sinks
 |
Back half of house, from kitchen
 |
Front half of house, from LR
 |
Front half of house, from library
 |
Back half of house, from FR
 |
Exterior
 |
|