216 Ridgedale Rd

Wed 12 November, 2003

Final plumbing rough-in wraps up, and routing of gas supply lines to mechanical closet for the furnace and water heater begins.

Gas line leaving meter
Gas line heads under patio doors
Back door now opens
Gas line enters house, runs to ceiling
Elbow across FR ceiling
Running across FR
Over duct, then along it to mech. closet
Furnace gas connection
Electrical connections for furnace
Drain line, water lines for second sink
Vent for second sink
Vent line again
Furnace exhaust, air inlet lines
Furnace lines prepare to head to west wall
Drain, supply lines in half-bath
PVC lines for furnace
Shower rough-in for second bath
Rear of mixer valve for shower
Shower line
Tabs
Remaining insulation
Gas supply line along furnace
Cable TV, phone access
   


Prev Main Next