Final plumbing rough-in wraps up, and routing of gas supply lines to
mechanical closet for the furnace and water heater begins.
Gas line leaving meter
 |
Gas line heads under patio doors
 |
Back door now opens
 |
Gas line enters house, runs to ceiling
 |
Elbow across FR ceiling
 |
Running across FR
 |
Over duct, then along it to mech. closet
 |
Furnace gas connection
 |
Electrical connections for furnace
 |
Drain line, water lines for second sink
 |
Vent for second sink
 |
Vent line again
 |
Furnace exhaust, air inlet lines
 |
Furnace lines prepare to head to west wall
 |
Drain, supply lines in half-bath
 |
PVC lines for furnace
 |
Shower rough-in for second bath
 |
Rear of mixer valve for shower
 |
Shower line
 |
Tabs
 |
Remaining insulation
 |
Gas supply line along furnace
 |
Cable TV, phone access
 |
|
|