Sheetrock installation begins. Plumbers return in the morning to
finish rough-in for drains for both the whirpool tub and the tub/shower
in the second bathroom.
North kitchen wall finally insulated
 |
Water heater vent pipe takes a turn
 |
Near-final routing for half-bath vent
 |
Joist spreaders installed
 |
New junction box for furnace in mech. closet
 |
Looking into FBR
 |
They covered up the window!
 |
Looking out of second bath
 |
Laundry room &c, at top of stairs
 |
Looking into MBR doorway
 |
"Open to below"
 |
Front and rear bedrooms
 |
MBR closet
 |
Stub wall in MBR closet
 |
MBR window
 |
Which piece is next?
 |
Master bath -- puke green
 |
Wanna hop in?
 |
Drain line for whirpool tub
 |
Overflow drain for tub
 |
Drain line for second bathtub
 |
Trip lever for second bathtub
 |
|
|
|