216 Ridgedale Rd

Sat 15 November, 2003

Drywall work continues. The second floor is almost finished, and a good chunk of the first is done. The walls are now sealed: What's in will stay in, and what's not, will stay out.

The family room lives!
Kitchen drywall
Library doorway
Library windows
Heating duct in library
Living room not yet done
Staircase wall still open
North kitchen wall covered
Looking down into kitchen from ladder
Spacious closet in RBR
West window in RBR
Looking across RBR
Looking along balcony to MBR
Looking back (west) along balcony
Second bath
Yummy green
Second bath wall should have been left open
The all-important 6" bumpout
West window in FBR
Front windows in FBR
A rather small closet
Window in MBR also walled over
Peering into master bath
East window in MBR
Larger east window in MBR
Lights above imaginary vanity
Leftovers
     