216 Ridgedale Rd

Wed 19 November, 2003

Taping and mudding of drywall begins, which also requires some additional drywall hanging around the heating ducts, door jambs, etc. The wrong water heater is delivered, and the bank is having trouble tracking the last draw on the construction portion of the loan.

Taping of living room wall and ceiling
Living room taped up
Staircase window trimmed with drywall
Da Box – concealing the ductwork
The boxed out duct continues . . .
Slightly smaller box in library
Library seams taped
The source of all things warm
The (wrong) water heater arrives
Progress in dining, family rooms
Seams partially finished upstairs
Hallway, RBR
Rear bedroom
Second bathroom
Front bedroom
Master bedroom
Green with white stripes
Finished breaker panel
   


Prev Main Next