Taping and mudding of drywall begins, which also requires some
additional drywall hanging around the heating ducts, door jambs, etc. The
wrong water heater is delivered, and the bank is having trouble tracking
the last draw on the construction portion of the loan.
Taping of living room wall and ceiling
 |
Living room taped up
 |
Staircase window trimmed with drywall
 |
Da Box – concealing the ductwork
 |
The boxed out duct continues . . .
 |
Slightly smaller box in library
 |
Library seams taped
 |
The source of all things warm
 |
The (wrong) water heater arrives
 |
Progress in dining, family rooms
 |
Seams partially finished upstairs
 |
Hallway, RBR
 |
Rear bedroom
 |
Second bathroom
 |
Front bedroom
 |
Master bedroom
 |
Green with white stripes
 |
Finished breaker panel
 |
|
|