Heap o' goodies in the LR
 |
18" square tile for kitchen
 |
Recptacles installed in kitchen
 |
Furnace wiring complete
 |
The hot, hot, hot water heater arrives
 |
Hole in floor filled in
 |
Family room, with outlets
 |
Malbros stone tile for first floor bath
 |
Switches in first floor bath
 |
Living room finishing almost done
 |
Another peek into the library
 |
Finished "window" across stairs
 |
A line connects two points . . .
 |
(Im)Possible marble threshold
 |
Things look reasonably plumb
 |
Interesting lines for fridge nook, pantry in kitchen
 |
Finished refrigerator niche
 |
Pantry without a back walls
 |
Water main patiently awaits connection
 |
Ascending the ladder of impossible grade
 |
Rear bedroom
 |
Birds-eye view of the furnace and cold-air ducting
 |
A box of grout joins the tile for second bath
 |
Close-up of Gambarelli Asia peacock by Ceratec
 |
The easy part is done
 |
Hallway switches
 |
Whirlpool tub passes leak tests, drained
 |
Tiny gap at west edge of house
 |
Siding has been delivered
 |
Saran wrap obscures the surely stunning color
 |
Bathroom bath and lavatory faucets have arrived
 |
As have the two kitchen sinks
 |
|
|
|