216 Ridgedale Rd

Sun 30 November, 2003

Review of work completed last Wed and Fri.

Siding works its way across the front of the house
Row upon row of cedar
East side complete
Final caulking of seams and holes
Kitchen tile, grouted
Kitchen from dining room
Half-bath tile, sealed (still wet)
Far corner of half-bath
Water heater installed
A snug fit
Water main fully connected at last
Vent for water heater not yet connected
Tile in second bathroom, grouted
Entrance to second bathroom
Few leftovers from the tile-laying
Cutout for shower to be installed in master bath
       