Yesterday, the cedar siding was nearly finished, including
installation of the remaining (and tricky) triple window over the "open
to below" space. In the kitchen, we applied a base coat of flat white
primer and then finishing coats to the walls and ceilings in preparation
for the assembly of the kitchen cabinets today.
The stairs have arrived. After a visit from the "stair guy" we decide
that the product is dimensioned properly for the space alotted.
Upper kitchen cabinets waiting
 |
North wall cabinets
 |
The edge of the kitchen has just been defined
 |
Stairs
 |
Front finally finished
 |
SE corner shot
 |
SW corner
 |
Back nearly done -- and it's still snowing
 |
Closeup of main rear window
 |
View of snow through new rear triple window
 |
Darkness and light
 |
Unfinished wall and window duo
 |
Those stairs should go right here . . .
 |
Peering down the "open to below"
 |
Looking up the "open to below"
 |
Ready for paint and trim
 |
GFI outlets for whirpool in master bath
 |
Staircase at ease
 |
Kitchen cabinets being staged in LR
 |
Base corner cabinet &c in the LR
 |
First cabinets go up as one piece
 |
Let me guess . . . this is the kitchen?
 |
View from the LR
 |
Duct box-wall boundary in LR ceiling
 |
Kitchen walls edged, ceiling not
 |
Look, Ma, no edges! (pantry ceiling)
 |
(Later) Kitchen assembly complete
 |
Second sink base not installed
 |
View from living room
 |
|