216 Ridgedale Rd

Wed 24 December, 2003

Lots of activity:

Remnant of the stub wall, with orig. flooring underneath
3/8" oak flooring at bottom of stack
Dishwasher installation in progress
Supply lines for main kitchen sink
Half-bath toilet installed
Handleset for front door
Outside view of front handleset
Outside light also in place
Patio door handles installed, too
Extension to catwalk to support railing
Recessed lighting over kitchen sink
Recessed lighting over side counter
Almost finished patching mech. closet entrance
   