New compound mitre (aka "chop") saw
 |
Drywall mud brought to pipes for fire-proofing
 |
Floor nosing lines stair opening
 |
Colonial oak floors come into view
 |
Brazilian cherry in the MBR
 |
Sunlight glancing off the cherry in the MBR
 |
Half-finished master bath
 |
Shower wall patched, ready for primer/tile
 |
Maple vanities (1 of 2) for master bath
 |
Now we call it the "catwalk"
 |
Peering into the front bedroom
 |
Second bath
 |
Faucet and fixtures
 |
Tub/shower in second bath
 |
Dartmouth toilet by Toto
 |
Undermount bowl -- some assembly was required!
 |
Looking out of second bath
 |
Flooring in front bedroom
 |
The plants havs already started to move in
 |
Oak nosing -- unfinished -- defines edge of flooring
 |
Looking down at the stairs -- railing yet to come
 |
Clever return ends nosing
 |
|
|
|