216 Ridgedale Rd

Thu 15 January, 2004

Hardwoon flooring (3/8" engineered walnut, glue-down) installed on the first floor. All interior pre-hung doors are in, though most are not fully finished. First-floor and second baths are fully trimmed out, save for window and door trim.

Major furniture and boxes moved in.

Furniture in MBR
Luggage in the master bath
Across MBR, toward door and closet
Apparel in darkness
Looking down to walnut objects below
Newel post framing fashioned from Al
Doors on F and R BR's
RBR stacked with furniture, boxes after move
Stackable furniture -- what an innovation
The important stuff is at the bottom of the stack
New tool and paint location in FBR
Stacks of stuff from library
Doorknob, robe hook, and amaryllis in second bath
   